fbpx
Cherrywood Aerial Shot

Kilsaran Products Featured:

Over 40,000 tonnes of Asphalt

Main Contractor                

John Craddock Ltd and Jons Civil  Engineering Ltd                                                  

Kilsaran Roadsurfacing and Contracting are proud to have undertaken the significant infrastructure development work on the Cherrywood Strategic Development Zone (SDZ) recently.

The main contractor on the Cherrywood Infrastructure Project is a joint venture between John Craddock Ltd and Jons Civil Engineering Ltd working for Hines, the Houston based owner,
developer and asset manager of the SDZ. Development of roads,
cycle ways, carparks and recreational areas in this SDZ necessitated the production and installation of over 40,000 tonnes of asphalt. All pavements have been completed to surface course level. This development is unique in that the Local
Authority required completed infrastructure to be in place
prior to the development of any building work, which is due to commence shortly on this 390-acre masterplanned development site. 

Cherrywood
Cherrywood
Cherrywood
Cherrywood

Related projects

Back To Top